Ird when replacing a gas boiler in a boiler room. Gas boiler in a private house: replacement procedure

Engineering systems 24.06.2019
                  Engineering systems

Or ryegas), request permission to reinstall. Wait for an answer (from 1 day to several months, depending on the number of applications) and pay permission, get technical conditions.

If the installation requires the transfer of gas pipelines or a boiler, the layout of gas pipelines is changed or the type of boiler is changed, then a new project needs to be developed. Contact a specialized company that has a license for this type of work (you can get their addresses in the gas service). The cost of design work will be determined depending on the amount of work.

If you make a normal replacement that does not require a change in the project, simply get a building passport from the replacement organization and submit it to the VET of the gas distribution organization. Check the smoke and ventilation ducts (DVK), also give the act to gorgaz. In addition, a certificate of conformity is also required for imported equipment.

When installing a new boiler, monitor all actions of workers. Please note - before starting dismantling, the heating system is flushed so that deposits and dirt do not clog the heat exchanger, the pump, the switching valve and other elements of the boiler do not fail.

Make sure that the workers, when dismantling the old boiler, first disconnect it from the gas pipeline, then disconnect the heating system from the input side cold water and from the side of the boiler, the boiler was finally cut off from the smoke exhaust system.

After installing the boiler, make sure that it stays firmly on the wall and that the possibility of accidental breakage is excluded. Please note - with proper marking, the chimney hole is located directly opposite the smoke outlet.

Check the correct connection sequence: first, the boiler is connected to the smoke exhaust system, then to the gas pipeline using fittings, then to the heating and hot water supply system (if the system provides such a possibility). Please note - workers must check all seams and joints for soldering defects.

After connecting to the mains, a test run of the gas boiler is performed. Learn all the features of controlling your boiler, about temperature control and additional functions.

Outdated gas equipment  must be replaced if it is out of order or does not comply with the new safety standards. Most often, there is a need to replace gas stovecolumn or counter.

You will need

  • - new equipment;
  • - services of a gas distribution organization;
  • - permission of regulatory authorities.

Instruction manual

Find out if you are eligible for replacement equipment for free. Your region may have a modernization program. gas equipment  for large, low-income families, participants of the Second World War or disabled people. Clarify this question with gas specialists, and even better - read the relevant provision on preferential treatment in your gorgaz.

If you still decide to replace the gas equipment  yourself, pick up in the store and buy the appropriate equipment. First, be sure to check whether the installation of such equipment is possible - for example, you cannot connect a gas boiler in an apartment building (unless all the apartments follow your example), there may also be problems with a smokeless boiler in a private house, etc. Feel free to buy equipment  the same type as you had before the replacement - you won’t even need to re-design the project documentation.

In order to install gas equipment  other type, consult with experts beforehand. Find out if you can increase the size of the stove, taking into account the dimensions of your kitchen, how best to place it (taking into account fire safety), whether an additional circuit breaker or socket is required.

When the preparatory work is completed, find the right equipment in the store and buy it. Try to get gas equipment in a trusted store providing a long warranty and after-sales service. The equipment must have all the necessary documents and certification (for imported equipment, a certificate of conformity is additionally required).

If replaceable equipment  differs from what you had before, ask Gorgaz for permission to reinstall by writing a statement. After it is issued to you, pay and receive the technical conditions.

Replacing a gas boiler
  Over time, equipment not only degrades its performance and efficiency, it also becomes obsolete. This means that it not only works worse than the new one, but also does not meet modern technical standards and achievements. This applies to all things, but most of all you should pay attention to the devices that ensure our lives. Some apartment buildings and many private houses have their own boiler rooms, where there is a heating system that warms the residents of the house in the cold winter.

In addition to the fact that the mechanism should work well, not use excessive amounts of energy and have a low noise level, it must be as safe as possible because it is located inside residential buildings.

The legislation also provides for special rules for the arrangement of boiler rooms.

If your AOGW is noisy, smoked, its efficiency has decreased, repair costs begin to approach the cost of a new boiler, or it just has reached its age (wall-mounted - 8 years old, floor-mounted - 15 years), then it is time to replace it. At the moment, the market has many options for new boilers of different capacities and configurations, but they are mainly divided into 2 types:

  • closed boilers. Their peculiarity lies in the fact that the burner is located in a chamber hermetically separated from the room in which the apparatus is located, and the influx of fresh air and the output of combustion products occurs through a coaxial pipe. Its structure consists of two pipes - one in the other, which allows one hole to be used for air outlet and flow. Closed-type boilers have a relatively low power (up to 35 kW), but are volatile mechanisms, since they require additional connection to a power source to provide ventilation;
  • open-type boilers have an open burner, that is, air is supplied to the fire from the boiler room itself, where combustion products are also thrown. Equipment of this type can have greater power compared to closed-type boilers (from 30 kW), but the requirements for the room where the boiler is located are more stringent and require intensive ventilation. The advantage of open-type boilers over closed ones in their non-volatility.

Boilers can have from 1 to 2 circuits. Single-circuit boilers are capable of heating water for only one consumer, for example, for heating rooms. Bypass has the ability to work immediately on 2 fronts: heating and the creation of hot water for domestic purposes.

Gas boiler replacement procedure

Since the gas boiler is an important and responsible part of the housing, its installation and maintenance takes place only through special state bodies (gorgaz, oblgaz, raigaz) through accredited enterprises specializing in this kind of work. The procedure for the replacement and installation of boiler equipment should in no case take place without the knowledge of the authorities and the hands of homeowners. Not because of the complexity of the task, but because this is a responsible matter and, if improperly performed, can endanger people's lives. Dismantling can also be done with your own hands.

Step-by-step instructions for replacing the boiler:

  1. Writing an application to the responsible authority (gorgaz, oblgaz, raigaz) for permission to replace the boiler. At the same time, you should know that if the boiler is replaced with a similar one, then the project remains the same, if the type of the boiler, the gas pipe supply scheme or the location of the gas boiler are changed, the project will have to be developed anew.
  2. When the answer is received, it is necessary to take the construction passport from the company replacing your boiler and transfer it to the gas service. Also, the gas distribution company will need an inspection certificate for the internal combustion engine (smoke ventilation ducts) and, in the case of replacing the boiler with imported equipment, a certificate confirming compliance with domestic safety standards.

After that, a company with a certificate for gas equipment replacement can replace your old boiler with a new one. When dismantling an old boiler and installing a new one, it is useful to know the technology by which this happens, to prevent actions that could lead to malfunctioning of the gas equipment installed in your boiler room, so the following is the procedure for installing a new boiler and removing its predecessor.

Removing an old boiler

Disassembly Instructions:

  1. First of all, while the old boiler still stands still, it is necessary to flush the entire heating system of the house. This is necessary in order to wash away all the dirt accumulated in the heating system, otherwise they may adversely affect the operation of the new unit.
  2. After that, completely drain all the water from heating system  and boiler.
  3. First, the boiler is disconnected from the gas source, then from the heating system and the source of cold water. The final step in disconnecting the boiler will be the disconnection from the ventilation system, if the boiler is closed.
  4. The boiler is free and can be removed from the room.

Installing a new boiler

Only a specialized organization is entitled to install a new gas boiler, and it is forbidden to do this with your own hands.

List of tools and materials:

  • boiler;
  • bracket;
  • ball valve - 3 pcs;
  • the mesh filter on a water supply system - 2 pieces;
  • a filter that normalizes the content of impurities in water;
  • gas tap or valve;
  • gas meter;
  • thermal shutoff valve;
  • gas indicator;
  • three-core cable;
  • voltage regulator;
  • uninterruptible power supply device;
  • level;
  • anchor bolts;
  • metal sheets for the gap between the wall and the boiler, if the wall is made of combustible material;
  • metal pipes for gas and water.
  1. The room under the boiler room in a private house can be made on any floor, except for living quarters, a toilet and a bathroom. In the basements of apartment buildings, the installation of a boiler room is prohibited.
  2. The room temperature should not exceed 35 and not be lower than 5 degrees Celsius.
  3. The level of humidity should not cross the limit of 80%.
  4. The boiler room area must be at least 4 sq.m. with a ceiling height of more than 2.5 m.
  5. The width of the doorway should be at least 80 cm.
  6. There must be windows in the boiler room, the minimum area of \u200b\u200bwhich is calculated in proportion to 100: 1 (the area of \u200b\u200bthe walls to total area  windows).
  7. When installing an open type boiler, it is necessary to provide the boiler room with good ventilation. The size of the ventilation hole is calculated in proportion of 8: 1 (hole area in cm to the boiler output in kW).
  8. Gas pipes are allowed only from metal.
  9. The diameter of the chimney depends on the capacity of the boiler and is calculated by the formula: boiler power * 4.3 \u003d diameter of the chimney in cm.
  10. The area should be larger than the cross-sectional area of \u200b\u200bthe hole for its connection.
  11. The chimney should rise at least 0.5 m above the highest roof element.
  12. The material of the chimney should be metal.
  13. The chimney must not have more than 3 turns and bends.
  14. The connecting device and the chimney must be no longer than 25 cm.

% D0% 95% D1% 81% D0% BB% D0% B8% 20% D0% B2% D1% 81% D0% B5% 20% D1% 81% D0% B4% D0% B5% D0% BB% D0 % B0% D0% BD% D0% BE% 20% D0% B2% D0% B5% D1% 80% D0% BD% D0% BE% 20% D0% B8% 20% D1% 81% D0% BE% D0 % B1% D0% BB% D1% 8E% D0% B4% D0% B5% D0% BD% D1% 8B% 20% D0% B2% D1% 8B% D1% 88% D0% B5% D1% 83% D0 % BA% D0% B0% D0% B7% D0% B0% D0% BD% D0% BD% D1% 8B% D0% B5% 20% D0% BF% D1% 80% D0% B0% D0% B2% D0 % B8% D0% BB% D0% B0,% 20% D1% 82% D0% BE% 20% D0% BD% D0% BE% D0% B2% D1% 8B% D0% B9% 20% D0% BA% D0% BE% D1% 82% D0% B5% D0% BB% 20% D0% B1% D1% 83% D0% B4% D0% B5% D1% 82% 20% D1% 80% D0% B0% D0% B1% D0% BE% D1% 82% D0% B0% D1% 82% D1% 8C% 20% D0% B8% D1% 81% D0% BF% D1% 80% D0% B0% D0% B2% D0% BD% D0% BE% 20% D0% B4% D0% BE% D0% BB% D0% B3% D0% BE% D0% B5% 20% D0% B2% D1% 80% D0% B5% D0% BC% D1% 8F,% 20% D0% BD% D0% B5% 20% D1% 81% D0% BE% D0% B7% D0% B4% D0% B0% D0% B2% D0% B0% D1% 8F% 20 % D0% BE% D0% BF% D0% B0% D1% 81% D0% BD% D0% BE% D1% 81% D1% 82% D0% B8% 20% D0% B4% D0% BB% D1% 8F % 20% D0% B6% D0% B8% D0% B7% D0% BD% D0% B8% 20% D0% BB% D1% 8E% D0% B4% D0% B5% D0% B9.% 20% D0% 9C% D0% B5% D1% 80% D0% BE% D0% BF% D1% 80% D0% B8% D1% 8F% D1% 82% D0% B8% D0% B5% 20% D0% BF% D0% BE% 20% D0% B7% D0% B0% D0% BC% D0% B5% D0% BD% D0% B5% 20% D0% BA% D0% BE% D1% 82% D0% BB% D0% B0% 20% D0% BD% D0% B5% D0% BB% D1% 8C% D0% B7% D1% 8F% 20% D0% BD% D0% B0% D0% B7% D0% B2% D0% B0% D1% 82% D1% 8C% 20% D0% BD% D0% B8% D0% B7% D0% BA% D0% BE% D0% B7% D0% B0% D1% 82% D1% 80% D0% B0% D1% 82% D0% BD% D1% 8B% D0% BC,% 20% D0 % BD% D0% BE% 20% D0% BA% D0% BE% D0% B3% D0% B4% D0% B0% 20% D0% BE% D0% BD% D0% BE% 20% D0% B1% D1 % 83% D0% B4% D0% B5% D1% 82% 20% D0% BF% D0% BE% D0% B7% D0% B0% D0% B4% D0% B8,% 20% D0% B2% D1% 8B% 20% D1% 81% D0% BC% D0% BE% D0% B6% D0% B5% D1% 82% D0% B5% 20% D1% 81% D0% BD% D0% BE% D0% B2% D0% B0% 20% D0% BD% D0% B0% D1% 81% D0% BB% D0% B0% D0% B6% D0% B4% D0% B0% D1% 82% D1% 8C% D1% 81% D1% 8F% 20% D1% 82% D0% B5% D0% BF% D0% BB% D0% BE% D0% BC% 20% D0% B8% 20% D0% BA% D0% BE% D0% BC% D1% 84% D0% BE% D1% 80% D1% 82% D0% BE% D0% BC% 20% D0% B2% 20% D0% B2% D0% B0% D1% 88% D0% B5% D0% BC% 20% D0% B4% D0% BE% D0% BC% D0% B5.

The situevina is ripe - we are changing the gas boiler, the smoking room is dying. We have almost decided with the boiler, take Junkers. And what about the documentation, what is needed and where to go first?

For starters - in gorgaz. If you have already decided on a new boiler, then write down its full name, if you have already bought it, take the boiler passport with you. You also need a passport of the person with whom you will conclude a contract for connecting gas to the boiler (for example, your personal passport), a house passport with the gas part of the project. An act of inspection of smoke and ventilation ducts for compliance with applicable standards will also be necessary, you need to get it at the nearest fire works. In gorgaz, you coordinate the replacement of the boiler, sign up for a gas shutdown. After gorgaz shuts down the old boiler, mount a new one (yourself or hire people). Gas connection - back to gorgaz.

We have to replace the boiler in a private house. What documents are needed?

Serg_i_K wrote: For starters - to gorgaz. If you have already decided on a new boiler, then write down its full name, if you have already bought it, take the boiler passport with you. You also need a passport of the person with whom you will conclude a contract for connecting gas to the boiler (for example, your personal passport), a house passport with the gas part of the project. An act of inspection of smoke and ventilation ducts for compliance with applicable standards will also be necessary, you need to get it at the nearest fire works. In gorgaz, you coordinate the replacement of the boiler, sign up for a gas shutdown. After gorgaz shuts down the old boiler, mount a new one (yourself or hire people). Gas connection - back to gorgaz.


No, a lot of inconsistencies. In accordance with the requirements of regulatory and technical documents in force in the Russian Federation, the procedure is as follows.
1. It is always necessary to start with obtaining technical specifications for the replacement of equipment.
For this, indeed, it is necessary to contact the gas distribution organization, but the documents are as follows:
- documents of ownership of land and home,
- passport of the owner.
2. After obtaining the technical conditions, it is necessary to contact the design organization having a certificate of admission to this type of work, where the project will be developed and agreed with the gas distribution organization that issued the technical specifications.
3. Having a coordinated project in hand, you can conclude an agreement with a specialized organization that has a certificate of admission to this type of work for the installation of equipment and commissioning of the facility.

The gas equipment used in the private sector is classified as high hazard. Therefore, all actions for installation, repair, maintenance and replacement of the boiler are carried out exclusively by specialists. They have passed deep theoretical training and acquired skills for handling gas equipment. A special license is issued for such activities.

Using rated power and productivity, a calculation is made for the thermal energy generator used to heat a private house. If the parameters are reduced, it is necessary to update the boiler equipment. There may be many reasons for installing new boilers. We take inadequate performance as an example. Often the heated area increases due to the extension, new appliances are connected that heat the terraces and basements. It may be necessary to introduce additional functionality. To ensure comfort and coziness in a private house, a hot water circuit is required. And the use of dual-circuit gas models generally combines a water heater with a heating boiler. Today, instead of atmospheric boilers and units where there is a forced exhaust of flue gases, condensation heating devices have appeared. The efficiency of new equipment has increased by 110%. Replacing the boiler is often associated with wear and tear on the old one. It is better to replace it in a timely manner, saving money, because it is very expensive to constantly repair an installation that has been in operation for a long time.

In order to replace the gas boiler, as EnergyService.com.ua experts say, legal issues are solved first, and having received the support of the gas supervisory authorities, we can begin practical implementation. We adhere to the following sequence of actions. We submit an application to the gas service at the place of residence in order to obtain permission. We get the technical conditions where the project should correspond to the early version, if we need to coordinate the increase in the volume of gas consumed, after inspecting the metering devices and pipes we get a conclusion. Further, it is necessary to conclude a contract with a company engaged in installation and performing subsequent warranty service. Then follows the dismantling of the old unit and the installation of a new boiler. It all ends with the acceptance and commissioning of the equipment to the gas control service.

It is necessary to provide a solid package of documents in order to avoid possible problems in case of violation of norms and independent replacement of gas equipment. Firstly, if the boiler is imported, it will be necessary to provide a certificate indicating the standards that correspond to domestic indicators. If the model is double-circuit, there is a need for a sanitary-hygienic conclusion on hot water for domestic use. Typically, a mall issues all of this documentation. Further, an act is needed where it is confirmed that the smoke and ventilation ducts are suitable for use, as well as an act stating that the boiler is connected to engineering systems. For a period of one year, a contract is concluded with the company for warranty service of the equipment. Often problems arise if changes are made to the project, because the most important thing is that all the steps involved in installing the boiler are legal.

There is an opinion that it is very simple to remove old equipment, but if there is no experience, the task may become more complicated: a leak in the tightness of the connection of the heating system pipelines may occur. Imagine the most common list of actions required for dismantling. Using a tap, disconnect from the gas line; de-energize devices that depend on electricity; we block the pipeline that connects heating and water supply; then we carry out the disconnection of pipes providing the system fluid cycle; disassemble the structure with which the chimney is connected.

To install a new boiler, it is also necessary to perform a large amount of action. It may be necessary to transfer gas pipes, run power cables, or even equip a special drain to recycle acid condensate. If a new boiler is used, but old heating, then filtering devices are installed. The best option if washing the grid or a special filter cartridge is provided. If you are going to convert gravity heating into a closed form, then you need to mount the valve and tank. Specialists, upon completion of the equipment replacement procedure, hand over the facility to supervisory authorities. Prerequisites are also commissioning activities. The system is filled with coolant, the unit is tested for functionality, and traction in the pipe is being checked. To replace gas equipment, it is better to contact specialists. With a quality installation, the equipment will function for a long time without the need for refinement or repair.

P.S. My name is Alexander. This is my personal, independent project. I am very glad if you liked the article. If you searched for something and did not find, then you have a chance to find it right now. Below is a link to what you recently searched. I will be glad if I find you useful twice.

Gas boiler - the main device for individual heating of cottages, houses, apartments, which uses gas as an energy source. The boiler heats the water that flows through the pipes, heating the rooms.

Like any other gas equipment, the boiler should be connected only by a specialist who has permits, special tools. Youdo.com exchange.

Therefore, the cost of installing a gas wall-mounted boiler is significantly different from the floor, for which all devices must be purchased and installed separately. For many modern wall-mounted boilers, a chimney device is not required, which also affects the price of the work.

It is worth remembering that the cost of installing a gas boiler does not include the cost of materials, they must be paid separately.

Installation and installation of gas boilers - requirements and rules, methods and norms of installation

  If all the rules are met, he must issue a conclusion, on the basis of which you can open the gas "valve" leading to the boiler; The heating system must be pressurized to P \u003d 1.8 atm (see on the boiler pressure gauge); Decontaminate the heating system; Check all connections for leaks; It is imperative to install a voltage stabilizer for the boiler and preferably an uninterruptible power supply; Do not add antifreeze to warming water.

Replacing a gas boiler in a private house: documents, rules and procedure

  To dual-circuit models, it is additionally necessary to have a sanitary-hygienic conclusion, which relates to hot water for domestic needs. As a rule, retailers provide this package along with a warranty card. The act of verification with a positive conclusion about the suitability of smoke and ventilation ducts. Act on the results of connecting the boiler to engineering systems, as well as an act on covert work when laying a coaxial chimney through the wall. Warranty service agreement concluded for at least 1 year with a service organization. The cornerstone in the documentation is the project, as amended.

Gas boilers

According to the change to the rules of technological connection No. 1203 of 11.16.16 if the replacement of the domestic gas equipment does not entail a change in the size of the permissible MCRH, such replacement shall be made by the applicant independently. The subscriber is obliged to notify the gas distribution. organization on the implementation of such a replacement within 5 working days from the bottom of the replacement. But! It is not safe to carry out an independent replacement of equipment! Therefore, contact gorgaz with an application for permission.

Rules for replacing a gas boiler in a private house

  4. Installation work is carried out by a licensed organization, permission to perform gas hazardous work. PJSC "Kharkovgorgaz" does not provide installation services for the gas supply system. 5. Before starting installation work, an application for technical supervision is drawn up for 5 working days. After 100% prepayment, technical supervision and acceptance into operation of the facility is carried out. They do not require the development of technical specifications, but a preliminary design is carried out in cases of replacing old gas appliances without changing their location and without changing the cross section of the smoke channel to exhaust combustion products to similar ones technical specifications  and functions, a draft design is being developed by the installation site master of the Repair and Construction Service. When installing or replacing a gas boiler or column, it is necessary to have an Act on the suitability for operation of smoke and ventilation ducts (DVK act). If you intend to involve a non-gas distribution company in the installation (replacement) of gas equipment, make sure that the organization you hire has the right to carry out these works.

licenses for construction and installation works, including with a gas supply system issued by the State Architectural and Construction Inspectorate of Ukraine; permits for the performance of work of increased danger issued by the Main Directorate of Gostrud in the Kharkov region. If any work (construction, installation or design) is carried out by the gas supply service provider (installation, transfer or replacement with equipment of another type), first you need to obtain the technical conditions for the gasification of the facility.

Gas boiler installation instructions: when is autonomy permissible?

They are available for self-installation. Any other gas heating boiler for installation requires professional work. However, there is a blessing in disguise - specialized companies take upon themselves the preparation of the premises with paperwork. But why only the “scissor tips” you can install yourself? The simplest boiler is really very simple: a gas burner, a heat exchanger - that's all.

In this regard, the GP “Beltopgaz” on January 23, 2013 suspended the cooperation agreement with NP Ergotech Minsk, the Republic of Belarus, to eliminate the identified non-compliance. Household gas metering devices purchased by consumers before 02/01/2013 will be installed to subscribers of gas supplying organizations with restrictions. We recommend that, subject to the specified criteria, with a note on the date of sale in the meter’s passport, contact the branch of RPM Gomeloblgaz at the place of residence for its installation.

Answers on questions

  Inna, good morning! Since the specialists of our company are not involved in the maintenance and repair of gas equipment and the situation you described is most likely connected with the call of the master of JSC Dinskaya Raigaz, it’s more appropriate to ask your question on the website www.kraygaz.ru The cost of the installation is calculated by the city gas supplier - the organization directly involved in the installation counters. The appropriateness of the installation is determined by the Law on Energy Saving.

Replacement, installation, installation of a heating boiler in a house or cottage

  2. The contract for the commissioning of the boiler - the original, 3. The act of demarcation between the service organization and the Branch of the State Unitary Enterprise MO Mosoblgaz in the form of a branch Specialized organization producing maintenance  a gas appliance (boiler) must have the documents for submission to the Mosoblgaz State Institution: 1. Certificate of admission of a specialized organization for the construction of gas facilities (installation of gas systems and equipment, installation of boiler plants, commissioning of boiler plants and auxiliary equipment and automated systems  management) (1 copy, certified by the seal of the company); 2.

Subject: Insulation of facades with foam in Dnepropetrovsk.  We perform high-quality insulation of facades with foam and basalt wool in Dnepropetrovsk.

Subject: Green House Project in Buenos Aires  The realm of wood and glass.

Subject: Natural linoleum  Which manufacturers do you choose? I liked the natural linoleum of the Swiss company Forbo (Forbo).

Topic: What is the best insulation for the ceiling? Dear forum users, I ask for your help! I was going to warm the recently completed veranda. What is the best way to do this?

Single Window Service

; - A copy of the technical passport (technical plan) for home ownership; - A copy of the title deed for home ownership. The list of requested documents: - Application; - The act of checking chimneys and ventilation ducts for design (NPO "Prevention", Pochtovaya St., 44; - A copy of the technical passport (technical plan) for home ownership; - A copy of the title document for home ownership.

The list of requested documents: - Application; - Act of inspection of chimneys and ventilation ducts for design (NPO "Prevention", Pochtovaya St., 44)

Replacing boilers

  Combustible walls near the boiler are sheathed with a layer of refractory material. Before changing the pump, you need to decide what version is needed: with a wet or dry rotor. The first option is better suited for home use, as it has low efficiency, but is unpretentious in maintenance. The pump with a dry rotor is designed for industrial use and utilities. During installation, a filter is installed on the side of the coolant, and on both sides of the pump - ball Valves. Features of replacing pipes depend on what material will be used.

Installation of gas boilers: 11 secrets of installation

  The installation of a gas heating boiler in the basement or on the ground floor in a private house by the state is allowed only in single-apartment blocking residential buildings. You must get the technical conditions for connecting an apartment or house to the city gas supply. To obtain such a document, write a statement, be sure to indicate in it the estimated gas consumption per hour. The document is drawn up in the city gas service. Registration will take about 1-2 weeks.

Dear Alla Alexandrovna, you need to contact a specialized operational organization (in your case, Anapagorgaz OJSC), with a statement to obtain technical conditions for connection to gas supply networks, and an application of a package of documents in accordance with the decree of the Government of the Russian Federation of February 13, 2006

“On approval of the rules for determining and providing technical conditions for connecting an object capital construction  to the networks of engineering and technical support and the rules for connecting the capital construction facility to the networks of engineering and technical support ”
. The cost of a set of work on gasification of home ownership is determined depending on the amount of work required for the implementation (both design and installation), types and quantities of installed gas equipment.

Gas companies make people pay a lot of money for non-existent violations

  As a result, I have installed in the kitchen gas water heater, AOGV-20 boiler, one stove. The house has a G-6 counter. I signed acts on the work performed. I have all the documentation for this equipment, certificates. For many years, representatives of "Kievgaz" conducted checks and found no violations. Problems started in 2014. At first, the neighbors began to complain to me that the gas men suddenly found some kind of violation, they frightened them with the costs of their elimination and huge fines.