On the current prices of ferrous metal scrap. About current prices of ferrous metal scrap cipher MRR new

For fitting and installation work 14.11.2020

The government of Moscow
Committee of the city of Moscow on pricing policy in construction and state examination of projects

ORDER

On the current prices of ferrous metal scrap


Based on paragraph 4.2.5 Regulations on the Committee of the City of Moscow on the pricing policy in the construction and state examination of projects approved by the Resolution of the Government of Moscow of February 24, 2011 N 48-PP

order:

1. To approve and put into action on February 29, 2016, the protocol for monitoring current prices for ferrous metal scrap.

2. To establish that the protocol prices are applied when calculating return amounts in estimated documentation for construction, reconstruction and overhaul enterprises, buildings and structures carried out with the involvement of the budget of the city of Moscow.

3. Financial support department, competitive procedures and monitoring of subordinate institutions (Koreshkov Yu.A.) Place within a 3-day period on the website of MoskomExpertizes The protocol for monitoring current prices for ferrous metals scrap.

4. Control of the execution of this order reserve.

Chairman
V.V. Lonov

Appendix 1. Protocol for monitoring current prices for general construction materials


Consumer: Participants in the investment and construction process funded from the budget of the city of Moscow

Product Name, Appointment and Brief Technical Specification

Unit is

Price for damage.
(rub .Kop.), VAT is not subject to

applied
in the report. Period

agree
involved

Scrap of ferrous metals.

Type of scrap 3a.

The composition of the scrap: the overall steel lump scrap and waste, peeled from harmful impurities (sizes of a piece of no more than 800x500x500 mm; metal thickness is not less than 6 mm; channels and 2-way walls with a wall thickness of at least 4 mm in an amount of no more than 20% of the battery mass; pipes With an outer diameter of no more than 150 mm and a wall thickness of at least 6 mm; pipes with a large diameter should be flattened or cut by forming)

View of scrap 5a.

The composition of the scrap: oversized steel lumpy scrap (metal thickness of at least 6 mm)

View of scrap 12a.

The composition of scrap: varietal waste, roofing, pipes (metal thickness less than 6 mm; maximum linear dimensions no more than 3500x2500x1000 mm)

View of scrap 17a.

The composition of the scrap: the overall cast iron scrap and waste (the size of a piece of no more than 300 mm, weighing no more than 40-20 kg, but not less than 0.5 kg)

View of scrap 20a-22a.

Scrap composition: oversized cast iron scrap and waste

Note: Prices Franco Warehouse Receiver. The price used in the reporting period is approved by order of 16.07.2015 N 79.


Chairman of the Committee of the City of Moscow
on pricing policy in construction and
state examination of projects
V.V. Lonov



Electronic document text
prepared Codex JSC and drilled by:
official website of Moskomexpertizes
mKE.MOS.RU (Copy Scanner)
as of 03/23/2016

Government of Moscow

Committee of the city of Moscow on pricing policy in construction and state examination of projects

Order of September 22, 2016 â„– MKE-OD / 16-51

On approval of the enlarged value change index material resourcesnot provided for by the estimated-regulatory framework of the TSN-2001, in the current price level of the 14th quarter of 2016 to the basic price level of 2000, indices change the cost of equipment at the current price level of the 14th quarter of 2016 to the basic price level of 2000, the cost of change ratios "Other works »Consolidated estimated calculation in the current price level of the 14th quarter of 2016 to the basic level of 2000 prices

In accordance with clause 4.2.11, the provisions on the Committee of the City of Moscow on the pricing policy in the construction and state examination of projects approved by the Moscow Government Decree of February 24, 2011 No. 48-PP,order:

1.1. The enlarged index for changing the value of the material resources not provided for by the estimated regulatory framework of the TSN-2001, in the current price level of the 14th quarter of 2016 to the basic price level of 2000 in the amount of 4,97 .

1.2. Indices Changes in the cost of equipment at the current price level of the 14th quarter of 2016 to the basic price level of 2000 (Appendix 1).

1.3. The coefficients (indexes) of changes in the value of "other works and costs" of a consolidated estimated calculation at the current price level of the IV quarter of 2016 to the baseline price level of 2000 (Appendix 2).

2. The department of financial support, competitive procedures and control over subordinate institutions to ensure the placement of indexes and coefficients on the official website of MoskomExpertizishttp: // www. MKE. MOS. Ruup to September 25, 2016

3. Control of the execution of this order is reserved.

Chairman V.V. Leonov

Appendix 1 to the orders of Moskomexpertiz

Equipment value changes in the current price level of the IV quarter of 2016 to the basic price level of 2000

No. p / p

Industry

Index

Economy in general

3,73

Agriculture, hunting and provision of services in these areas

3,73

Food production, including drinks

4.22

Textile production

3,79

Treatment of wood and manufacture of wood and tubes, except furniture

3,42

Publishing and printing activities, replication of recorded media

3,63

Production of coke and petroleum products

4,34

Chemical production

4,46

Manufacture of other non-metallic mineral products

3,70

Metallurgical production

4,37

Production of finished metal products

4,22

Manufacture of office equipment and computers

3,88

Manufacture of electrical machinery and electrical equipment

3,88

Production of equipment for radio, television and communication

4,06

Manufacture of medical equipment, measuring instruments, optical instruments and equipment, hours

3,96

Manufacture of cars, trailers and semi-trailers

3,80

Production, transmission and distribution of electricity, gas, steam and hot water

4,24

Collection, purification and distribution of water

4,15

Building

3,63

Wholesale trade, including trading through agents, except for trade in motor vehicles and motorcycles

3,80

Retail trade, excluding trade in motor vehicles and motorcycles; Repair of household products and personal items

3,85

Hotel activities and restaurants

4,60

Activities of land transport

4,00

Water transport activities

4,35

Air transport activities

4,44

Communication

2,87

Financial intermediation

3,78

Insurance

4,02

Real estate operations

3,75

Providing other types of services

4,00

Mandatory social security

3,36

Education

3,49

Health and provision of social services

3,48

Removal wastewater, waste and similar activities

3,63

Activities for the organization of recreation and entertainment, culture and sports

3,48

Appendix 2 to order MoskomExpertiz

Changes (indexes) of changes in other works and costs of the consolidated estimated calculation at the current price level of the 26th quarter of 2016 to the basic level of 2000 prices

No. p / p

Name of other works and costs of consolidated estimated calculation

Coefficient

Earth fee for seizure (redemption) land plot under construction

5,94

Rental fee for land for design and construction

5,94

Compensation for the reserved green plantings in cash (turns into a local estimate on the cutting of green plantings)

5,61

Compensation for the demolished structures and garden plantings, compensation of losses and losses on the transfer of buildings and structures (or the construction of new buildings and structures instead of demolished), when damages are compensated for land

5,61

Reimbursement of expenses related to the relocation of residents from the demolished residential buildings

6,29

Reimbursement of forestry production losses caused by seizure (redemption) for the construction of forestry land

5,61

Costs for transportation by road workers of construction and installation organizations or compensation for the cost of organizing special routes of urban passenger transport. Considered when carrying out construction outside of Moscow and the absence of urban passenger routes

6,29

Costs associated with the community of workers to perform construction, assembly and special works. If the transportation of employees is carried out by its own or leased transport of a construction organization, travel costs for travel expenses are not included, and are counted according to claim 7

6,29

Costs associated with content and operation during the construction of environmental protection objects: sewage treatment plants, wastewater treatment, etc.

5,61

The cost of paying the traffic police on supporting oversized and heavy cargo

6,29

Order of December 23, 2016 N MKE-OD / 16-72

On approval of the integrated index for changing the value of material resources,
Not stipulated by the estimated-regulatory framework of the TSN-2001, in the current level of prices I quarter of 2017 to the basic price level of 2000, indices change the cost of equipment at the current price level of the first quarter of 2017 to the basic price level of 2000, the coefficients (indexes) of the cost changes "Other works and costs" consolidated estimated calculation at the current price level of the first quarter of 2017 to the basic price level of 2000

In accordance with clause 4.2.11, the provisions on the Committee of the City of Moscow on the pricing policy in the construction and state examination of projects approved by the Moscow Government Decree of February 24, 2011 No. 48-PP, order:

1.1 Enlarged index for changing the value of material resources not provided for by the estimated-regulatory framework TSN-2001, at the current level of prices I quarter of 2017 to the basic level of 2000 prices in the amount of 4,92.

1.2 Indices Changing the cost of equipment at the current price level of the first quarter of 2017 to the basic price level of 2000 (Appendix 1).

1.3 The coefficients (indices) changes in the cost of "other works and costs" of a consolidated estimated calculation at the current price level of the first quarter of 2017 to the baseline price level of 2000 (Appendix 2).

2. The department of financial security, competitive procedures and control over the subordinate institutions to ensure the placement of indices and coefficients on the official website of MoskomExpertizations www.mke.mos.ru in the prescribed manner.

3. Control of the execution of this order is reserved.

Chairman
V.V. Leonov

Attachment 1
By order of MoskomExpertizis
dated 12/23/2016 N MKE-OD / 16-72

Changes in the cost of equipment in the current price level of the first quarter of 2017 to the basic price level of 2000

No. p / p Industry Index
1 2 3
1. Economy in general 3,73
2. Agriculture, hunting and provision of services in these areas 3,73
3. Food production, including drinks 4,22
4. Textile production 3,79
5. Treatment of wood and manufacture of wood and tubes, except furniture 3,42
6. Publishing and printing activities, replication of recorded media 3,63
7. Production of coke and petroleum products 4,34
8. Chemical production 4,46
9. Manufacture of other non-metallic mineral products 3,70
10. Metallurgical production 4,37
11. Production of finished metal products 4,22
12. Manufacture of office equipment and computers 3,88
13. Manufacture of electrical machinery and electrical equipment 3,88
14. Production of equipment for radio, television and communication 4,06
15. Manufacture of medical equipment, measuring instruments, optical instruments and equipment, hours 3,96
16. Manufacture of cars, trailers and semi-trailers 3,80
17. Production, transmission and distribution of electricity, gas, steam and hot water 4,24
18. Collection, purification and distribution of water 4,15
19. Building 3,63
20. Wholesale trade, including trading through agents, except for trade in motor vehicles and motorcycles 3,80
21. Retail trade, excluding trade in motor vehicles and motorcycles; Repair of household products and personal items 3,85
22. Hotel activities and restaurants 4,60
23. Activities of land transport 4,00
24. Water transport activities 4,35
25. Air transport activities 4,44
26. Communication 2,87
27. Financial intermediation 3,78
28. Insurance 4,02
29. Real estate operations 3,75
30. Providing other types of services 4,00
31. Mandatory social security 3,36
32. Education 3,49
33. Health and provision of social services 3,48
34. Removal of wastewater, waste and similar activities 3,63
35. Activities for the organization of recreation and entertainment, culture and sports 3,48

Appendix 2.
By order of MoskomExpertizis
from 12/23/2016 N MKE-OD / 16-72

Camefficients (indexes) Changes in the cost of other works and costs
Consolidated estimated calculation at the current price level I quarter of 2017
to the basic price level of 2000

No. P.P. Name of other works and costs of consolidated estimated calculation Coefficient
1 Fee for land in seizure (redemption) of the land plot for construction 5,99
2 Rental fee for land for design and construction 5,99
3 Compensation for the reserved green plantings in cash (turns into a local estimate on the cutting of green plantings) 5,65
4 Compensation for the demolished structures and garden plantings, compensation of losses and losses on the transfer of buildings and structures (or the construction of new buildings and structures instead of demolished), when damages are compensated for land 5,65
5 Reimbursement of expenses related to the relocation of residents from the demolished residential buildings 6,34
6 Reimbursement of forestry production losses caused by seizure (redemption) for the construction of forestry land 5,65
7 Costs for transportation by road workers of construction and installation organizations or compensation for the cost of organizing special routes of urban passenger transport. Considered when carrying out construction outside of Moscow and the absence of urban passenger routes 6,34
8 Costs associated with the community of workers to perform construction, assembly and special works. If the carriage of employees is carried out by its own or leased transport of a construction organization, travel costs for travel expenses are not included, and are counted according to claim 7 6,34
9 Costs associated with content and operation during the construction of environmental protection objects: sewage treatment plants, wastewater treatment, etc. 5,65
10 The cost of paying the traffic police on supporting oversized and heavy cargo 6,34

Order of the Moscow Committee on Provision Policy in Construction
of January 22, 2016 No. ICE-OD / 16-2

"On approval of the coefficients of recalculating the estimated cost of construction of state ordering facilities in the current price level"

In accordance with clause 4.2.11, the provisions on the Committee of the city of Moscow on the pricing policy in the construction and state examination of projects approved by the Resolution of the Moscow Government of February 24, 2011 No. 48-PP, I order:

1.1. The enlarged index of changing the value of material resources not provided for by the estimated-regulatory framework of the TSN-2001, in the current level of prices I quarter of 2016 to the basic level of 2000 prices in the amount of 4.69.

1.2. Indices change the cost of equipment at the current price level of the first quarter of 2016 to the basic price level of 2000 ().

2. Head of the Financial Supply Department, Competition Procedures and Control over the subordinate institutions Koreshkov Yu.A. Ensure the placement of the index and the application specified in P.P. 1.1, 1.2 on the official website of MoskomExpertizi http://www.mke.mos.ru in 3 days.

3. I leave control over the execution of the order for the Deputy Chairman of the Committee - the head of the contract service R.Yu. Maslov.

application

by order of the Moscow Committee
on pricing policy in construction
and state examination of projects
of January 22, 2016 No. ICE-OD / 16-2

Indices change the cost of equipment at the current price level I quarter of 2016 to the basic level of 2000 prices

No. p / p

Industry

Index

Economy in general

2,96

Agriculture, hunting and provision of services in these areas

2,96

Food production, including drinks

3,35

Textile production

3,01

Treatment of wood and manufacture of wood and tubes, except furniture

2,71

Publishing and printing activities, replication of recorded media

2,88

Production of coke and petroleum products

3,45

Chemical production

3,53

Manufacture of other non-metallic mineral products

2,93

Metallurgical production

3,48

Production of finished metal products

3,35

Manufacture of office equipment and computers

3,08

Manufacture of electrical machinery and electrical equipment

3,08

Production of equipment for radio, television and communication

3,22

Manufacture of medical equipment, measuring instruments, optical instruments and equipment, hours

3,16

Manufacture of cars, trailers and semi-trailers

3,02

Production, transmission and distribution of electricity, gas, steam and hot water

3,37

Collection, purification and distribution of water

3,28

Building

2,88

Wholesale trade, including trading through agents, except for trade in motor vehicles and motorcycles

3,02

Retail trade, excluding trade in motor vehicles and motorcycles; Repair of household products and personal items

3,05

Hotel activities and restaurants

3,64

Activities of land transport

3,18

Water transport activities

3,46

Air transport activities

3,51

Communication

2,28

Financial intermediation

3,00

Insurance

3,19

Real estate operations

2,98

Providing other types of services

3,18

Mandatory social security

2,67

Education

2,76

Health and provision of social services

2,75

Removal of wastewater, waste and similar activities

2,88

Activities for the organization of recreation and entertainment, culture and sports

We recommend to read