Dear visitors of the site www.site! Many of you, choosing a particular house project, ask yourself and us the most important question, this is the question of the cost of building a house. Calculating the cost of building your future home is very difficult, since the construction of a private house is purely individual and depends on many factors, the price can vary both in the direction of the cost of building a house, and cheaper. In the construction of a country cottage, it all depends on your needs, desires and capabilities. But, given the large number of questions visitors to the site about the cost of building the house projects presented in our catalog, we and our construction partners working in the Moscow Region are developing summary cost estimates for each house building technology using the most popular house projects as examples: brick houses, houses from cellular concrete (aerated concrete and foam concrete blocks), frame houses, timber houses, houses made of logs or hewn logs.
Today, visitors are most interested in projects. brick houses area up to 300 sq.m. Taking into account your wishes, we provide you with an approximate estimate for the construction of a house made of brick KP 265-3.
PROJECT OF THE HOUSE FROM PORIZED STONE KP 265-3
The project of a modern two-story house. On the ground floor there are two terraces, a vestibule, an entrance hall, a kitchen-dining room, a living room with a fireplace, a living room, a laundry room, a bathroom and a boiler room. On the second floor there are three bedrooms (one with access to the balcony), two wardrobes, a hall, separate bathroom and two bathrooms. House for permanent residence. Maximum number of residents: 6 people.
House project KP 265-3 in our catalog home projects \u003e\u003e
IMPORTANT! A box at home is not exactly the right definition, in fact, what is usually denoted by this phrase is called - thermal circuit of the house, which in turn consists of a foundation, box, roof. Please consider this observation when familiarizing yourself with the calculation below.
Estimated calculation of the construction of a box of a brick house
(thermal circuit of the house: foundation, box, roof) ( Construction of the thermal circuit of the house: foundation, box, roof)Construction work on the construction of the box of the house (thermal circuit) | ||||
Base: | construction of a house box according to the project KP 265-3, made of porous ceramic stone (block), with insulation and brick cladding of external walls, a warm roof covered with metal tiles, | |||
Technology: | porous ceramic stone house | |||
Contractor: | Construction of houses | |||
Estimated cost: | 4 858 715. 00 rub. | |||
Update Date: | valid until 09/01/2011 | |||
Stage 1. FOUNDATION | ||||
Name of works | Units rev. | Qty | We stand. materials | We stand. works |
Horizontal layout and axle leader | --- | --- | --- | --- |
Manual excavation and excavation with movement up to 10 meters | --- | --- | --- | --- |
Crushed stone base | --- | --- | --- | --- |
Sand cushion | --- | --- | --- | --- |
Installation of FL and FBS | --- | --- | --- | --- |
Backfilling the foundation walls with sand | --- | --- | --- | --- |
Waterproofing the walls of the foundation | --- | --- | --- | --- |
Installation, dismantling of the basement formwork from softwood boards 24 mm thick. | --- | --- | --- | --- |
Reinforcement frame device | --- | --- | --- | --- |
Plate fill at 0.000 | --- | --- | --- | --- |
Porch device | --- | --- | --- | --- |
Communications tab | --- | --- | --- | --- |
Procurement of materials | --- | --- | --- | --- |
Loading and unloading | --- | --- | --- | --- |
Technique (soil removal, unloading metal by crane, unloading by crane FL and FBS, concrete pump) | --- | --- | --- | 137500.00 |
Total | --- | --- | 580150.00 | 667275.00 |
Total foundation: work + materials | 1 384 925. 00 | |||
2. Stage. HOUSE BOX | ||||
Masonry bearing walls and partitions | --- | --- | --- | --- |
Masonry of internal walls and partitions | --- | --- | --- | --- |
Brick laying on pipes and ventilation ducts | --- | --- | --- | --- |
Facing brickwork with jointing | --- | --- | --- | --- |
Mortar preparation | --- | --- | --- | --- |
Wall insulation | --- | --- | --- | --- |
Installation and dismantle of the woods | --- | --- | --- | --- |
Procurement of materials | --- | --- | --- | --- |
Loading and unloading | --- | --- | --- | --- |
Fill cast | --- | --- | --- | --- |
Technics (Crane works, concrete pump) | --- | --- | --- | 109000.00 |
Total | --- | --- | 1054300.00 | 1145490.00 |
Total for the insulated box of the house with brick lining: work + materials | 2 308 790. 00 | |||
3. Stage. ROOF and ROOF | ||||
Installation of the final roofing (metal) with a rafter system and insulation. | --- | --- | --- | --- |
Handling. | --- | --- | --- | --- |
Procurement of materials. | --- | --- | --- | --- |
Total | --- | --- | 410000.00 | 755000.00 |
Total for the insulated roof with a finish coating of metal: work + materials |
1 165 000. 00 | |||
TOTAL COST OF THE HOUSE BOX
works and materials on the construction of the thermal circuit (foundation, load-bearing walls, partitions, roof and roof of the house) |
4 858 715. 00 |
The final amount for the construction of the box of the house, similar in terms of the design of the house project KP 265-3 will be 4 858 715 rubles.
It turns out: The cost of high-quality construction of one square meter of an insulated box of a house made of brick (ceramic block), with walls lined with bricks, with a warm roof and a finish coating with metal tiles will be 18 314.00 rub / m 2.
Please note that in house box cost Excluded:
- approval finished project at home in the relevant authorities;
- entrance floor of the 1st floor;
- Finishing work;
- design;
- materials and installation of internal and external engineering networks;
- materials and work on the improvement of the territory.
We devoted a series of articles to the issues of reducing the cost of building a house Stages of building a house"in which all these aspects have been maximally disclosed. Properly drafted construction estimate It will help you accurately determine your own capabilities, competently negotiate with contractors and choose the best option for organizing construction work.
Drawing up construction estimates is an important stage in the construction of a house! Properly designed estimate Allows you to reduce the cost of expensive materials. Require the contractor to draw up an estimate for the construction, according to the estimate you can track the costs of the purchase of building materials and construction work.
ATTENTION! This estimate is a preliminary version of the estimated calculation! Drawing up a full and detailed estimate for the construction of a particular house is a paid service.
Make a list of upcoming construction costs brick house Starting from laying the foundation to the roof, you can try it yourself. However, it is important to accurately consider the cost of all construction work and costs in order to determine the start time of the construction. In order to avoid difficulties that may arise when discussing upcoming work with the contractor, it is better to resort to the help of qualified specialists from construction companies or architectural bureaus who will correctly draw up an estimate for a brick house.
Most modern estimates for the construction of a brick house - An automated process that is implemented using special programs. These programs take into account the cost of each stage, depending on the complexity of the project (geometric parameters, number of floors, floors, superstructures, etc.), taking into account the costs of all types of work and materials. For simple construction, there are simple estimates programs for building a house of brick, which can be downloaded on the Internet and get the necessary calculations. Such programs summarize the costs of all cost items and ultimately give the final value, which can be very approximate. Specialists call such documents consolidated estimates, since they have the form of a list for some categories of work and costs without detailed details. Usually they are used for preliminary calculation in order to facilitate dialogue with the contractor.
Direct work is carried out according to a detailed estimate for a house made of brick, which differs from the enlarged one in greater accuracy, since it is more detailed. A qualified estimator will clearly identify all points terms of reference, coordinating them with all the specialists involved in the construction. In the detailed estimate, about 80% are direct costs, which include many items, starting from the cost of materials and equipment, including transportation costs, labor costs of involved specialists, the operation of involved equipment and vehicles, etc. This also includes estimates for bricklaying and for electrical work, etc.
Next section estimates for brick house takes into account overhead costs, which are: administrative and economic (remuneration for employees organizing and managing the construction process); expenses for staff training and education, all kinds of deductions (to a pension fund, equipment maintenance, etc.). The purpose of the estimated calculations is to cover all costs and ensure profit, which is the key to the success of the enterprise.
Brick house estimates have a similar development principle. However, the construction of a private brick house has its own nuances. For example, if the customer purchases building materials himself, then they do not fall into the budget. Modern developments present us with a wide selection of various building materials that have the best qualities (strength, stability, etc.) and save costs during the construction and operation of buildings. In this case, it is advisable to divide the estimate into parts. The owner independently takes into account the cost of materials, while choosing deliveries at competitive prices. Often, owners of private houses save money by independently performing some simple types of work. It is better to entrust the brickwork to specialists, having drawn up the relevant documents so that subsequently there will be no problems with unfair work or the purchase of low-quality materials.
Properly calculated estimate for the construction of a brick house Saves you a lot of money and simplifies cost control.
Such a complex enterprise as the construction of a brick house always requires preparatory actions. The most important of them is to calculate the cost of construction. This includes the calculation of bricks for building a house, and the cost of additional materials, and much more. We will tell you how to make a construction estimate and calculate all the costs.
Costing Principles
When calculating the cost of building a brick house, it is important to keep a balance: on the one hand, consider everything you need, and on the other, avoid unreasonable expenses. Of course, the calculation of the cost can only be approximate, because the real price of consumables, work, delivery of materials can change, and during the construction there will appear the necessary expenses that were not initially included in the estimate.
For example, there is a seasonal fluctuation in the prices of certain building materials, so it makes sense to purchase certain categories of building materials in advance, six months or even a year before the start of construction.
In the initial data, on the basis of which the estimate of the construction of a house from a brick will be calculated, make, first of all, the dimensions of the future house:
- its length and width;
- number of storeys;
- floor height;
- base height;
- skate height;
- length of load-bearing walls (in running meters);
- base area, etc.
Based on these figures, a further calculation of the consumption of all building materials, whether it is brick, plaster or wallpaper, is carried out. Therefore, the area of \u200b\u200bthe house and the remaining dimensions should be indicated very accurately. All these figures are written in the project of the future home, which the homeowner either orders from the design organization or buys ready-made (and this is also included in the construction estimate). And we must not forget that the total area of \u200b\u200ba residential building consists of the sum of all internal (and not external) areas plus the area of \u200b\u200bverandas, loggias and balconies (if any are in the project).
Another cost item for the construction of a brick house, one of the first to be included in the estimate, is the production of technical documents, design documents and for approval by state organizations. Then, the costs of utilities are taken into account - more precisely, the cost of connecting a house to them. A large item of expenses is the purchase and delivery to the place of construction of materials. If specially hired people will do the construction work (and when building a brick house it is always better to turn to professionals), then payment for their activities and accommodation (construction trailer with connected communications) is also included in the estimate. Of course, it is necessary to provide for force majeure circumstances and costs in this case in the estimate.
Foundation work
Consider the calculation of the cost of building a brick house on the example of arranging the foundation. Foundation work is divided into several stages:
- foundation planning, development and excavation, axle leader;
- arrangement of the bases from crushed stone and sand;
- the actual arrangement of the foundation (tape or reinforced concrete);
- arrangement of retaining walls of brick or concrete blocks;
- waterproofing;
- soil moving with special equipment.
At each stage, the unit of measurement is indicated, in this case it is one cubic meter, and the amount of material used (sand, gravel, concrete, soil). Then, the price per unit of the indicated volume of material and the total cost for the entire volume of work are indicated.
If the basement is planned in the house (half the house or the whole area), then a foundation pit is digging under it, and this is a separate type of work using special equipment.
Walls and roof
Engineering work
To engineering in the process of building a brick house include work on conducting electrical wiring throughout the house, arranging sewage and water supply. In addition, this includes solving the problems of heating the future home (for example, installing a fireplace).
In this part of the estimate, the cost of plumbing, electrical installation and heating works, as well as the price of appliances and equipment (gas boiler, stove-heater, plumbing equipment) are indicated.
Finishing work
Finishing work includes:
- covering the ceiling and walls with drywall;
- flooring with parquet, laminate, ceramic tiles;
- wall cladding;
- plastering, painting, carpentry, installation work.
The cost is indicated separately for each type of work. Separately painted materials: ceramic tile, parquet, laminate, drywall, paints, wallpapers, dry mixes, varnishes, etc.
For the convenience of calculations, you can use the construction calculator, which are many on the Internet on specialized sites. The cost of materials, their quantity, approximate cost of work are driven in, and at the exit the future homeowner receives an approximate, but understandable amount, which can be guided by in more detailed drawing up an estimate for building a house of brick.
So, it turns out that the calculation of building a house from a brick may well be done by the owner of this house himself, without resorting to third-party services. The most important thing in drawing up an estimate is to have an accurate project of the house and to know its area, both general and detail. Based on these figures, the cost of building materials and the work performed is calculated.
The total amounts will be inconclusive, because the full cost of the work is influenced by many factors (seasonal price fluctuations, unforeseen circumstances), but they can be guided when laying the budget for construction.
The construction of even a relatively small structure is associated with significant costs, the exact determination of which is difficult. The calculation of the estimates for the construction of a house made of bricks is made at the stage of design work in the form of a separate document. Developers, as a rule, are specialized companies or architectural bureaus.
The basis for the work of the design organization is the task issued by the customer. An ordinary citizen without special education has a rather rough idea of \u200b\u200bthis process. It is rather difficult to conduct a dialogue with the performer in this situation.
A preliminary estimate of the estimated cost of the work is necessary to make an informed decision on the start of work. You can try to make the calculations and yourself for which a complete list of materials and planned work is compiled from laying the foundation to the erection of the roof.
However, an inexperienced person will not be able to take everything into account; instructions are needed and the more detailed the better.
Modern methods of determining value
In modern conditions, the lion's share of settlement and design work is carried out using special programs. With their help, the total cost of the project and the price of individual operations are determined.
The development of such programs requires appropriate qualifications. However, there are simple applications on the Internet that will allow you to make calculations and get the necessary data, which will become the starting point in a conversation with the architect.
Typically, such services ask for some minimum information about the future structure.
Their list may vary and looks something like this:
- the number of floors and the presence of attic type superstructures;
- geometric dimensions: the length and width of the base, the height of the ceilings and so on;
- material of load-bearing walls and partitions, ceilings, beam-rafter systems and roofs.
The program, based on the information received, calculates and issues a total.
Such an estimate for the construction of a house of brick, of course, is very approximate, and has the form of a list in the following categories:
- calculation of the required amount of materials for the foundation, walls, partitions and further on the list;
- a list of planned works by category and type, but without full details.
As a result, a greatly simplified estimate or, as is customary to say among specialists, is obtained. It is suitable only for the most general estimates made by oneself. It can be used at the stage of preliminary consultations with the contractor.
To start work, an already developed estimate will be required, the difference between them can be up to 20-25%. This indicator depends on the completeness of the input information and in any case will be averaged.
Composition and main sections of the budget documentation
The estimate of a house made of bricks is formed by a civil engineer with the appropriate qualifications, an employee of a specialized company or architectural bureau. For the most accurate and complete calculation it is necessary: \u200b\u200bexperience, time and clearly formulated technical specifications.
In the process of performing the work, the engineer interacts with other employees working on this project.
Direct construction costs
This expense item is the largest and in numerical terms it can reach up to 75-80%, and in some cases even higher.
They are associated with the direct construction and installation work at the facility and includes the following items:
- the cost of building materials, structures, equipment, taking into account all transport costs and even the cost of their acquisition;
- salary fund of all involved construction company employees directly involved in the work at the facility;
- operating costs associated with the use of special equipment and vehicles, this expense item includes the remuneration of the operators of these machines and mechanisms.
This section may include highlighted subsections: such as estimates for bricklaying or electrical and other operations.
Overhead
For the full existence of any enterprise, an administrative apparatus, engineering and technical personnel are needed. These employees do not directly participate in construction work, however, without them the functioning of the enterprise is impossible.
A complete list of overhead costs is as follows:
- administrative and business related to the need for rational organization and management of the process, as well as to the maintenance staff, tax and other mandatory contributions, and the like;
- service for employees of the main construction enterprises of the company, training and advanced training, this also includes contributions to the pension fund;
- expenses for the organization of work directly on construction siterelated to the maintenance, maintenance and repair of equipment and the like.
Estimated profit
The goal of any creative work is the production of products, in the case of construction organizations, such products are a building, building or structure. The rate of profit of the enterprise is determined in accordance with the governing documents, and its base is the size of the wage fund.
In private companies, this value is determined by the owners and cannot be lower than a certain level of profitability. Failure to comply with this principle threatens the company with bankruptcy. Since the excess of expenses over income leads to a gradual loss of working capital and fixed assets of the organization.
Formation of estimates for the construction of a private house
The general principles of costing are the same for all organizations. In the application of the organization of the construction of a private house, there are some features. So, the main materials: building bricks, cement, sand, gravel and others can be purchased by the owner and not be included in the general estimate. This is an extremely common practice.
Our fellow citizens are increasingly choosing innovative materials that provide cost savings during the construction and maintenance of buildings. Double silicate brick M 150 has a number of valuable operational and technological parameters.
It has a lower specific gravity while maintaining indicators of mechanical strength and resistance to environmental conditions.
Elements of the register of construction costs
In our country, often to save money in the construction of a country house or cottage, the owners perform part of the work on their own. To perform the most complex operations, such as masonry, specialists are involved. In this case, documenting is often not done.
Useful advice: to ensure the liability of workers, including material, it is recommended to conclude a contract for masonry or other operations.
This will allow for compensation from the wage earner.Sample contract for the supply of building materials
Advice!
If it is planned to build a relatively large facility, then the purchase of all necessary immediately impractical.
In this case, it is better to purchase parts, having concluded the appropriate contracts for the supply of materials on a certain schedule.A legally competent sample of the contract for the supply of bricks can be found on specialized sites or to develop it yourself.
Conclusion
In turn, this is positively reflected and saves considerable money.